At Breetec, we do not shy away from a challenge - not even when it involves large-scale and technically complex infrastructure projects. From engineering to production and installation: we deliver custom total solutions.
As part of beautification works at the Ottignies train station, our team realized an impressive temporary access infrastructure. This station, part of a major railway axis, makes this assignment a true prestige project.
Impressive construction in numbers
As a temporary solution, we built a robust replacement staircase measuring no less than 17 meters in length. A total of three staircases are being installed, accounting for 47 tons of steel. Each element was fully custom-designed and produced, tailored to the specific conditions of the construction site.
Smart approach: efficiency on and off the site
To minimize the impact on the construction site and train traffic, the project was approached with extreme strategy. A large part of the work is carried out during nighttime track closures, which requires precise planning and flawless execution. In addition, the staircases are pre-assembled at a separate location in the largest possible modules. This approach allows the structures to be delivered just-in-time to the construction site, enabling safer assembly, significantly reducing on-site working time, and maximizing efficiency.
Safety, precision and customization
In a project of this scale, safety, precision, and efficiency are paramount. Our employees work with the utmost care and craftsmanship to guarantee that every structure meets the strictest standards.
This project perfectly underscores what Breetec stands for: translating complex needs into high-quality and sustainable solutions. Thanks to our integrated approach — from engineering to installation — and the dedication of an experienced and driven team, we achieve strong results even in challenging circumstances.